Annickbank

ACTS completed the detailed mechanical and electrical design for a newly built office pavilion at the Annickbank Innovation Campus in Irvine. Commissioned by North Ayrshire Council, the 350-square-metre building is set to attract small businesses specialising in the life sciences sector to this strategic development area.

It is the fifth office development at the campus, furthering the council's commitment to supporting business growth. The pavilion has been designed with flexible, self-contained floor plates that can accommodate bespoke office spaces.

Key features of the M&E design include electric hot water boilers, variable refrigerant flow units providing heating and cooling to the office spaces, and heat recovery units supplying mechanical ventilation.

A fully integrated security and access control system provides robust operational protection, while energy-efficient LED lighting ensures sustainability and cost savings. This new office pavilion exemplifies low-carbon, energy-efficient design, achieving an Energy Performance Certificate (EPC) rating of A+ and a platinum sustainability label.


St Mary Axe, London

ACTS has been involved in numerous fit-out contracts at the iconic 30 St Mary Axe
building (The Gherkin) which is located in London’s Square Mile.

A current project which we are undertaking for our client involves the complete
refurbishment of tenant occupiable space on the 30th floor. The design brief involves
reconfiguration of all M&E services to suit the new architectural layout which include:

  • Re-configuration of the addressable lighting control system

  • Re-positioning of the modular LV power systems to suit the new furniture layout

  • Installation of temporary fire alarm and voice evacuation system during reconfiguration
    works of the main systems

  • Full communications server room renewal inclusive of fibre optic interlinking between
    client occupied floors

  • Fan coil unit repositioning and re-configuration to serve the new layout

  • Alterations to the existing sprinkler system to ensure system coverage is maintained